Tenaska Kiowa Power Plant Harris Comm. Case Study
28 January 2014 - 2:07, by , in Case Studies, No comments

Harris Communications was able to provide a self-install solution for a power company located in rural Oklahoma.  Kiowa Power contacted us seeking a solution for their office building.  It is a green building which are commonly known to block cellular signals.

In this situation it was more economical to recommend a self-install due to the size of the solution and the remote location of the facility.  We were able to work with the client over the phone and email to gather all of the relevant information to design an efficient and effective solution for Kiowa Power.

Harris Communications packaged all of the materials and wrote a self install handbook specific to the Kiowa facilities solution.  We were able to deliver a comprehensive self install solution within the budgetary needs and guide the client through the install as well.  In most cases we prefer to conduct a site survey, design and implement the solution.  This was a unique situation given the square footage of the facility and remote location.

It was a pleasure to work with Kiowa Power and we are available to consult you on your facility as well.  Contact us today to learn more about how we can create a cost effective solution to improve your cellular service.

About author:

Leave a Reply